Toros Tarım A.Ş. Mersin Plant Bagging Building Reinforced Concrete Reinforcement – Renovation and Renovation of Steel Construction Loading Sheds
Reinforced Concrete Reinforcement was made by making B.A Sheathing on columns and beams starting from the foundation, breaking the excessively deformed floors completely and laying B.A again.
After reinforcement, the floors are covered with Acid-resistant Mastic Asphalt, All the walls are demolished and rebuilt, and the Exterior and Interior are completely painted with special Acid-resistant Epoxy Putty, Epoxy Primer and Double Layer Epoxy paint.
Extremely deformed B.A stairs were demolished and steel construction stairs were made.
The exterior steel porches were sandblasted and painted with Epoxy Paint and the Roof Coverings were completely replaced.
Reinforced concrete reinforcement works were carried out in 4 months and in 9 months in total with other renovation works.
| DETAIL | |
|---|---|
| Employer | TOROS TARIM A.Ş. (Tekfen Holding Foundation) |
| Time of work | August 2019 / April 2020 |