Toros Tarım A.Ş. Samsun Plant Jibs Field 1st Phase Construction
It consists of two stages, 180.000.00 m² waste pool and 20.000.00 m² Pond, on a 250.000.00 m² area. During the execution of these works, 1.650.000,00 m³ of soil movement has occurred in total with Excavation and Filling, and 202.000.00 m² of HDPE Membrane has been laid and impermeability has been ensured. Crack area repaired with 25,000 m2 high strength felt, 28,300 m2 gas drainage geocomposite, 31,000 m2 P.P. drainage mat is laid. Drainage system was created by laying 6,000,00 mt HDPE Pipe and Piezometer devices were installed to measure liquid pressure at different points.
İş sürecinde 7 Ekskavatör, 3 Dozer, 2 JCB Mini Ekskavatör, 1 greyder, 1 Silindir, 1 Arazöz ve 12 adet hafriyat Kamyonu Çalışmıştır.
Anahtar teslimi olarak 12 ayda yapılmıştır.
| DETAIL | |
|---|---|
| Employer | TOROS TARIM SAN. TİC. A.Ş. (Tekfen Holding Kuruluşu) |
| Time of work | June 2021/May 2022 |