The production of 47600 m² formwork, 13.500.00 m³ concrete, 1.880 tons of iron and 126.000.00 m³ formwork scaffolding for the Palandoken ski hotel, which has a closed area of approximately 28.000.00 m², was completed in 7 months with an average of 60 personnel.