Erzurum Palandoken Ski Hotel Construction
The production of 47600 m² formwork, 13.500.00 m³ concrete, 1.880 tons of iron and 126.000.00 m³ formwork scaffolding for the Palandoken ski hotel, which has a closed area of approximately 28.000.00 m², was completed in 7 months with an average of 60 personnel.
| DETAIL | |
|---|---|
| Employer | Etf Tekstil A.Ş. |
| Müşavir Firma | Loft Mimarlık San. Tic. Ltd. Şti. |
| Time of work | April 2008 / September 2008 |